Product Details
Place of Origin: CHINA
Brand Name: COOLNET
Model Number: MetaRack EC20
Payment & Shipping Terms
Minimum Order Quantity: 1PCS
Price: USD3000-10000/PCS
Packaging Details: Standard export package
Delivery Time: 20-35 working days
Payment Terms: L/C,T/T
Supply Ability: 200 SETS PER MONTH
Product Name: |
Micro Data Center |
Cabinet Configuration: |
1 Combined Cabinet; 28U Available IT Space |
Operating Voltage: |
220V / 40A |
Cooling System: |
3.5kW Rack-mounted Air Conditioner |
Product Name: |
Micro Data Center |
Cabinet Configuration: |
1 Combined Cabinet; 28U Available IT Space |
Operating Voltage: |
220V / 40A |
Cooling System: |
3.5kW Rack-mounted Air Conditioner |
Build a compact edge IT installation with integrated power, cooling and monitoring. The EC20 combines a rack UPS, precision rack air conditioner, power distribution and equipment space in one cabinet, helping branch offices and remote IT sites deploy a coordinated infrastructure package.
| Model | MetaRack EC20 |
|---|---|
| Cabinet arrangement | 1 combined cabinet |
| Available IT space | 28U in the published reference configuration |
| UPS | 3kVA rack-type UPS |
| Cooling | 3.5kW rack-mounted air conditioner |
| Input supply | 220V / 40A |
| Dimensions (W x D x H) | 600 x 1200 x 2000mm |
| Monitoring display | 10-inch touch screen |
| Redundancy | N reference configuration |
Specifications above describe the EC20 reference configuration in Coolnet's MetaRack technical brochure. Confirm IT load, cabinet space, battery autonomy, electrical connection, installation conditions and optional features before ordering. Rack height is not the same as available IT space after infrastructure is installed. Battery runtime depends on the selected battery system and actual load. Optional fire suppression must be specified separately.
It provides cabinet infrastructure, power, cooling and monitoring. Server and network equipment requirements should be defined separately.
The published EC20 reference configuration provides 28U. Confirm the final usable space when choosing battery and other options.
The EC20 reference configuration is N. Additional resilience requirements need project-specific design confirmation.
Yes. Specify the IT load and required backup duration so the battery configuration can be selected for the project.
The MetaRack monitoring platform supports remote access. Confirm enabled interfaces and optional SMS or app functions in the final proposal.