Product Details
Place of Origin: CHINA
Brand Name: COOLNET
Model Number: ER03
Payment & Shipping Terms
Minimum Order Quantity: 1PCS
Price: Negotiable
Packaging Details: Standard export package
Delivery Time: 20-35 working days
Payment Terms: L/C,T/T
Supply Ability: 200 SETS PER MONTH
Product Name: |
Micro Data Center |
Cabinet Configuration: |
1 Combined Cabinet + 2 IT Cabinets |
Operating Voltage: |
220V / 125A Input |
Cooling System: |
12.5kW In-row Cooling |
Product Name: |
Micro Data Center |
Cabinet Configuration: |
1 Combined Cabinet + 2 IT Cabinets |
Operating Voltage: |
220V / 125A Input |
Cooling System: |
12.5kW In-row Cooling |
The ER03 integrates one combined cabinet and two IT cabinets with power distribution, a 10kVA rack UPS, 12.5kW in-row cooling, and centralized monitoring. It is designed for compact edge infrastructure and distributed IT deployments.
| Item | ER03 Configuration |
|---|---|
| Cabinets | 1 combined cabinet + 2 IT cabinets |
| Available space | 29U + 2 x 42U (113U total) |
| UPS capacity | 10kVA, rack type |
| Power factor | 0.8 |
| Total power input | 220V / 125A |
| Cooling | 12.5kW in-row, sensible heat ratio 1 |
| Redundancy | N, typical configuration |
| Display | 10-inch touchscreen |
| Dimensions (W x D x H) | 2100 x 1200 x 2000 mm |
| Operating environment | 0-45°C; 0-95% relative humidity, non-condensing; below 1000m altitude |
Monitoring covers UPS, power distribution, air conditioning, water leakage, temperature and humidity, smoke, and door sensors. Functions include data collection and storage, alarm management, energy consumption analysis, and remote access. SMS, app access, sound/light alarms, ATS, and rack-mounted gas fire suppression are optional.
Battery backup duration depends on the selected battery configuration and load. Confirm the project requirements before ordering.
Suitable for edge computing, branch offices, and distributed server infrastructure where integrated power, cooling, and monitoring are required. Confirm IT load, rack allocation, electrical supply, site dimensions, and required battery autonomy during project selection.